We were tasked with surveying a portion of a Canyon that is located in the middle of our campus. The tools we were given were a total station, 2 prisms, leveling rods, stakes, and measuring tape. The time duration of this project was 10 hours and shot over 300 points.

My individual tasks ranged from being in charge of the theodolite, as well as holding the prism.