Add Work

Science Olympiad Tower 2017

Science Olympiad Tower 2017

Designed & built a 60cm high tower using balsa wood that weighed 13.25g and held at least 15kg. Placed...

favorite_outline
Ferguson Center Loading Dock Improvements

Ferguson Center Loading Dock Improvements

Infrastructure improvement project -Reinforced Concrete -Underground Utilities

favorite_outline
MATLAB PROJECTS

MATLAB PROJECTS

Various projects and codes that required we master algorithms of the trapezoidal rule, rungekutta, LU...

favorite_outline
Rain Cloud - Watch Project

Rain Cloud - Watch Project

Collaborated with 2 other Structural Engineering students and 1 Visual Arts student to design, plan...

favorite_outline
Assignment: Parking Lot

Assignment: Parking Lot

I was asked to recreate a given parking lot plan.

favorite_outline
Final Assignment

Final Assignment

The final assignment for EGCE 206 was to recreate a given floor plan with more detail using the skills...

favorite_outline
Initial Design Stage

Initial Design Stage

We had to make a prototype of our bridge and also learn form previous designs.

favorite_outline
Design of a Steel Structure by LRFD method

Design of a Steel Structure by LRFD method

An individual project involving the design of a 4-story steel structure based on IBC2006 using Load...

favorite_outline
Paper review and Presentation

Paper review and Presentation

As a team we had to review a paper on the behavior of small foundations in soft clay.

favorite_outline
Team Project

Team Project

A team project on Linear Analysis of rainfall-runoff data from an arid catchment in Oman using SAS.

favorite_outline
Downtime Modeling

Downtime Modeling

Research project on downtime modeling

favorite_outline
Plate Girder Design

Plate Girder Design

Based on IBC 2006, load was distributed. As per the load condition given in the project statement the...

favorite_outline